The construction of 工厂号机组 units 3 and 4 is progressing to provide a safe, 可靠的, clean and cost-effective source of electricity that will provide stable prices and improve Georgia's communities for generations to come.

客户的影响

从Vogtle扩张开始, Georgia Power has worked to pursue all available benefits for customers and minimize the impact of the new units on electric bills. In addition to the agreement to receive 100 percent of parent guarantee funds available from Toshiba by Dec. 15, 2017, the company recently announced a conditional commitment of approximately $1.67 billion in additional loan guarantees for the project from the U.S. 美国能源部. 

今天, after including anticipated customer benefits from federal production tax credits, interest savings from loan guarantees from the DOE and the fuel savings of nuclear energy, the projected peak rate impact to Georgia Power retail customers is approximately 10 percent, with 5 percent related to the project already in rates – well below original projections of approximately 12 percent.

建筑工人

CWIP

传统上, utility companies recover financing costs for construction projects after the project’s completion. Utility companies either finance or absorb cost of materials and labor. 在漫长的建设期间, this requires a tremendous amount of investment and financing costs including interest expenses. The construction and financing costs are then added to customer’s rates over the life-cycle of the plant.

Under Georgia Power’s 核 建设 Cost Recovery (NCCR) plan with CWIP in Rate Base and the 2016 Stipulation, 客户产生的“利息上的利息”费用更少. Recovery of financing costs during the construction period reduces the total return required over the life of the plant. CWIP in Rate Base also improves the credit ratings of utility companies, which often results in lower financing costs for the company overall. 更好的信用评级意味着公司更低的利息成本, 直接受益于客户的费率.

预制混凝土楼板组装区. 预制混凝土楼板组装区.
300吨的Vogtle 4号机组除氧器被放置. 300吨的Vogtle 4号机组除氧器被放置 inside the turbine building in late September.

CWIP的好处

  • Reduces the total projected rate increases for Vogtle 3和4 by approximately one-third.
  • Cuts financing costs hundreds of millions of dollars during the construction period, 直接受益的客户.
  • 有助于保持公司的信用评级, which will reduce borrowing costs and save customers tens of millions of dollars annually for all company projects (not just nuclear).
  • Eases the plant into rates in a way that does not cause “rate shock” by gradually increasing rates over several years during construction versus applying the full cost increase in just two years.
  • Reduces the in-service cost of the plant by approximately one-third, saving customers additional financing costs over the life of the plant.

美国能源部的贷款担保 

格鲁吉亚电力公司在2017年9月与美国达成了一项协议.S. 美国能源部 for a conditional commitment of approximately $1.67 billion in additional loan guarantees for the 工厂号机组 nuclear expansion project near Waynesboro, Ga.

佐治亚电力公司此前获得了3美元的贷款担保.460亿美元用于建设Vogtle 3号和4号单元.

With a total of more than $5 billion in anticipated 美国能源部的贷款担保s, Georgia Power expects to be able to provide more than $500 million in present-value benefits to its customers.

Final approval and issuance of these additional loan guarantees by the DOE cannot be assured and are subject to the negotiation of definitive agreements, 完成美国能源部的尽职调查, 收到任何必要的监管批准, (四)其他条件的满足.

东芝父母保证 

佐治亚电力公司和其他沃格特的共同所有人, Oglethorpe权力, MEAG电力和道尔顿公用事业公司, 一共收到3美元了吗.来自东芝的680亿母公司担保支付, the full amount owed by the parent company of former primary Vogtle contractor Westinghouse. Toshiba originally agreed to make monthly payments through January 2021 but, 根据本月早些时候达成的一项新协议, delivered all remaining installments in a single payment of approximately $3.12月14日的2250亿美元. 手机买球的app按比例分摊的费用是1美元.470亿年.

Parent guarantees were put in place to protect Georgia electric customers as part of the original contract for the Vogtle nuclear expansion. The payments will reduce the total cost of the plant for Georgia Power by approximately $1.7 billion with every dollar received from Toshiba being used to benefit customers.